Waterfront Dike Upgrade Project

Share Waterfront Dike Upgrade Project on Facebook Share Waterfront Dike Upgrade Project on Twitter Share Waterfront Dike Upgrade Project on Linkedin Email Waterfront Dike Upgrade Project link

The dike located along the Village’s waterfront currently provides flood protection for residents and visitors. This dike was constructed following the 1948 flood at a crest elevation that does not meet current design standards. The Village is undertaking upgrades to the dike to increase protection against inundation from high lake levels. Upgrades will include increasing the dike crest elevation and upgrading the wastewater treatment plant road to better withstand a large flood while allowing for access during emergency situations.


PROJECT OBJECTIVES


Protect the Village of Harrison Hot Springs from future flood events.
Enhance the accessibility and safety of access points to the park.
Maintain the park's functionality as a space for recreation, play, gathering and community events.
Allow for future infrastructure upgrades to meet changing climate conditions.
Preserve and enhance the character of the site by integrating new flood protection infrastructure into the existing waterfront park
Minimize site disturbance, including the removal of mature trees and the amount of site re-grading.


The consultants on the project, Northwest Hydraulic Consultants (civil/hydrotechnical engineers) and space2place (landscape architect) are looking for feedback from the public on conceptual design options and proposed plans for the upgrades.

The dike located along the Village’s waterfront currently provides flood protection for residents and visitors. This dike was constructed following the 1948 flood at a crest elevation that does not meet current design standards. The Village is undertaking upgrades to the dike to increase protection against inundation from high lake levels. Upgrades will include increasing the dike crest elevation and upgrading the wastewater treatment plant road to better withstand a large flood while allowing for access during emergency situations.


PROJECT OBJECTIVES


Protect the Village of Harrison Hot Springs from future flood events.
Enhance the accessibility and safety of access points to the park.
Maintain the park's functionality as a space for recreation, play, gathering and community events.
Allow for future infrastructure upgrades to meet changing climate conditions.
Preserve and enhance the character of the site by integrating new flood protection infrastructure into the existing waterfront park
Minimize site disturbance, including the removal of mature trees and the amount of site re-grading.


The consultants on the project, Northwest Hydraulic Consultants (civil/hydrotechnical engineers) and space2place (landscape architect) are looking for feedback from the public on conceptual design options and proposed plans for the upgrades.

  • CLOSED: This survey has concluded.

    The dike located along the Village’s waterfront currently provides flood protection for residents and visitors. This dike was constructed following the 1948 flood at a crest elevation that does not meet current design standards. The Village is undertaking upgrades to the dike to increase protection against inundation from high lake levels. Upgrades will include increasing the dike crest elevation and upgrading the wastewater treatment plant road to better withstand a large flood while allowing for access during emergency situations.

    The consultants on the project, Northwest Hydraulic Consultants (civil/hydrotechnical engineers) and space2place (landscape architect) are looking for feedback from the public on conceptual design options and proposed plans for the upgrades. 

     

    This short survey takes approximately 10 minutes to complete.  We appreciate your feedback! 

    We are looking forward to hearing from YOU, our residents, business operators, property owners and visitors. There’s no age limit on this important discussion. Whether you’re a senior citizen or a youth still at school, your opinion counts. 

    Responses to this survey will be accepted until January 12, 2024.

    The concept designs referenced in this survey are available here

    Take Survey