Beach Redevelopment

Share Beach Redevelopment on Facebook Share Beach Redevelopment on Twitter Share Beach Redevelopment on Linkedin Email Beach Redevelopment link

The Lagoon Walkway project is from the Village’s 2022/23 – 2024/25 Resort Development Strategy (RDS) utilizing Resort Municipality Initiative (RMI) grant funding. The project aims to provide a series of improvements to create a better experience for residents and visitors. By following design concepts identified in the 2019 Lagoon Area Master Plan, this project looks to address both aesthetic and functional aspects of the walkway, ensuring a more accessible environment and enhanced experience.

Key features of this project will include:

- Removal of existing vegetation, stones, and gravels on the inside edge of the lagoon which will be replaced with beach sand and new shade trees.

- Site furnishings which include waste receptacles, new benches, and opportunities for naturalized seating.

- Upgrades to the walkway to ensure smooth hard packed surface with consistent width compliant with universal accessibility standards.

- Walkway reconfiguration and area redesign adjacent to the boat launch parking lot.

- Addition of lighting in southeast section.

- Wayfinding maps and interpretive panels.


During construction there will be interruptions to lagoon pathway access. Closure notifications will be posted on our website, social media, and on site.

The Lagoon Walkway project is from the Village’s 2022/23 – 2024/25 Resort Development Strategy (RDS) utilizing Resort Municipality Initiative (RMI) grant funding. The project aims to provide a series of improvements to create a better experience for residents and visitors. By following design concepts identified in the 2019 Lagoon Area Master Plan, this project looks to address both aesthetic and functional aspects of the walkway, ensuring a more accessible environment and enhanced experience.

Key features of this project will include:

- Removal of existing vegetation, stones, and gravels on the inside edge of the lagoon which will be replaced with beach sand and new shade trees.

- Site furnishings which include waste receptacles, new benches, and opportunities for naturalized seating.

- Upgrades to the walkway to ensure smooth hard packed surface with consistent width compliant with universal accessibility standards.

- Walkway reconfiguration and area redesign adjacent to the boat launch parking lot.

- Addition of lighting in southeast section.

- Wayfinding maps and interpretive panels.


During construction there will be interruptions to lagoon pathway access. Closure notifications will be posted on our website, social media, and on site.

Page published: 01 Oct 2024, 01:37 PM