Accessible Playground

Share Accessible Playground on Facebook Share Accessible Playground on Twitter Share Accessible Playground on Linkedin Email Accessible Playground link

The Accessible Playground and Shade Features project is from the Village’s 2022/23 – 2024/25 Resort Development Strategy (RDS) utilizing Resort Municipality Initiative (RMI) funding.

Highlights of this project will include:

  • An accessible playground at the beachfront
  • Inclusive play features
  • Communication board
  • Fully wheelchair accessible we-go-round
  • Swings
  • Shade features

The existing 5-12 year old playground will be removed and replaced with new playground equipment. Rubber surfacing will be installed while still including a portion of the playground to have sand to support site maintenance by Village staff. A shade feature will be added above the existing tots beach playground to provide shade until this playground equipment reaches the end of its lifespan. At that time, staff will determine if any further play equipment is required or determine a usage for this covered space. Swings, including a molded bucket swing will be added to the existing grass area beside the tot playground with plans to add rubber surfacing at this location if future funding permits.

December 20, 2024 Update:

The Village is pleased to announce that our new accessible beach playground is officially open!








The Accessible Playground and Shade Features project is from the Village’s 2022/23 – 2024/25 Resort Development Strategy (RDS) utilizing Resort Municipality Initiative (RMI) funding.

Highlights of this project will include:

  • An accessible playground at the beachfront
  • Inclusive play features
  • Communication board
  • Fully wheelchair accessible we-go-round
  • Swings
  • Shade features

The existing 5-12 year old playground will be removed and replaced with new playground equipment. Rubber surfacing will be installed while still including a portion of the playground to have sand to support site maintenance by Village staff. A shade feature will be added above the existing tots beach playground to provide shade until this playground equipment reaches the end of its lifespan. At that time, staff will determine if any further play equipment is required or determine a usage for this covered space. Swings, including a molded bucket swing will be added to the existing grass area beside the tot playground with plans to add rubber surfacing at this location if future funding permits.

December 20, 2024 Update:

The Village is pleased to announce that our new accessible beach playground is officially open!








Page last updated: 20 Jan 2025, 02:09 PM